Skip to main content
Division 6 Services Logo
Division 6 Services
Life Sciences & Advanced Facilities

Vanguard BioTech Research & Innovation Campus

State-of-the-art life science campus featuring biophilic timber architectural features, antimicrobial lab casework, and high-performance acoustic lecture halls.

Vanguard BioTech main atrium and clean research pavilion
Main collaborative research pavilion with biophilic timber trellis ceiling and lab transition portals.
Sector
Life Sciences & Advanced Facilities
Location
South San Francisco, CA
Year
2023
Scope Area
92,000 SQ FT
Architect
Flad Architects
Construction Mgr
DPR Construction
Project Narrative

Overview & Background

The Vanguard Innovation Campus blends sterile clean-room research laboratories with warm, biophilic public zones designed to foster interdisciplinary collaboration among leading genomic researchers.

Detailed Scope

Scope of Work & Assemblies

Biophilic glue-laminated timber trellises in the central three-story winter garden, phenolic resin casework in specialized laboratory spaces, micro-slotted acoustic wall systems in lecture spaces, and exterior weather-resistant teak exterior courtyard canopies.

Engineering Execution

Challenges & Engineered Solutions

Technical Challenges

Rigorous clean-room air filtration mandates prohibited off-gassing adhesives and high-VOC finishes, necessitating zero-VOC certified materials throughout all lab-adjacent spaces.

Engineered Solutions

All timber components were pre-finished in our factory with water-based zero-VOC ultraviolet-cured coatings under controlled conditions. We passed all environmental air quality test clearances on first inspection.

Planning a Similar Project?

Our pre-construction team provides laser scanning, estimating, and value engineering during schematic design.

Contact Engineering Team
Photographic Documentation

Project Gallery & Detailing

Click any image to open full-screen viewer
Auditorium and presentation hall for scientific symposiums
300-seat scientific symposium hall with slatted maple acoustic paneling and integrated AV baffles.
Cleanroom transition ante-room with chemical-resistant solid surface casework
Transition modules featuring seamless solid surface cabinetry and antimicrobial finishes.
Relevant Workmanship

Related Completed Projects

Executive boardroom and sweeping atrium of The Lumina Tower
Corporate Workplace

The Lumina Tower Corporate Headquarters

A multi-floor corporate headquarters build-out featuring bespoke white oak millwork, precision acoustic ceilings, and a monumental central interconnecting stair.

San Francisco, CA View
Dramatic double-height lobby of The Grand Aethelgard Hotel
Hospitality & Luxury Resorts

The Grand Aethelgard Heritage Hotel

Historic landmark hospitality rehabilitation transforming a 1928 property into an ultra-luxury 140-key boutique hotel with restored heritage millwork.

Seattle, WA View
Initiate Project Bidding

Interested in Discussing a Similar Project?

Our estimators, project executives, and BIM engineers are prepared to review your plans and submit competitive, transparent proposals.